|
| General |
|---|
| • | Portable power supplies scaled to application requirements and adaptable to available energy sources including line, vehicle, wind, and solar | | • | Drop & operate wireless video surveillance and Automated License Plate Recognition (ALPR) systems | | • | Custom data acquisition, alarm, control, and communications systems of all types |
| In-building Communications |
|---|
| • | Site survey - site evaluation to determine the coverage enhancement requirements including objective and subjective signal level testing and reporting | | • | Coverage enhancement planning and design | | • | TOTAL built-in coverage enhancement system installations including standard IBC interface panel | | • | HYBRID built-in (donor and DAS only) coverage enhancement subsystems with standard IBC interface panel | | • | Post-treatment acceptance testing and reporting | | • | Annual recertification testing and reporting |
Please contact a SIPS Specialist to discuss your needs.
|